• Subscribe
  • E-Newsletter
  • Media Kit
  • Contact
  • Login
Campus Rec Magazine
  • Sections
    • Columns
    • Facility Development
    • News
    • Operations
    • Programming
    • Rec of the Month
    • Staff Development
    • Well-being
    • Profiles
  • Magazine
    • Current Issue
    • Past Issues
    • Subscribe
    • E-Newsletter
    • Contact Us
  • On-Demand
    • Exclusive Interviews
    • Podcast
    • Webinars
  • Supplier Insights
    • Brand Voice
    • Supplier News
    • Supplier Voice
  • Education
    • CR Leadership Summit
    • CR Base Camp
    • Pickleball Innovators
  • Buyer’s Guide
No Result
View All Result
  • Sections
    • Columns
    • Facility Development
    • News
    • Operations
    • Programming
    • Rec of the Month
    • Staff Development
    • Well-being
    • Profiles
  • Magazine
    • Current Issue
    • Past Issues
    • Subscribe
    • E-Newsletter
    • Contact Us
  • On-Demand
    • Exclusive Interviews
    • Podcast
    • Webinars
  • Supplier Insights
    • Brand Voice
    • Supplier News
    • Supplier Voice
  • Education
    • CR Leadership Summit
    • CR Base Camp
    • Pickleball Innovators
  • Buyer’s Guide
No Result
View All Result
Campus Rec Magazine
No Result
View All Result
Home Facility Development

Penn State Renovations From an Architect’s Perspective

Kyle Dyer by Kyle Dyer
January 10, 2017
in Facility Development, News, Renovations
0
Penn State
Share on FacebookShare on TwitterShare on LinkedIn

It has been a long journey, but soon, the Penn State Intramural Building Renovation will be complete. Over the past five years, through a series of phased projects, the building has been completely re-vamped and transformed. The entire project cost around $85 million to complete.

“I have been involved with the project from the very beginning in May 2009 — yes it was eight years ago,” said Troy Sherrard, partner for sports and recreation at Moody Nolan. “In May 2009, we did a building expansion design masterplan of the existing IM facility and ended up with ideally three phases. Since that time we have systematically implemented each phase.”

Phase one focused on fitness, adding 19,000 square feet of strength and cardio fitness space to the front-end of the building along with four group exercise studios. Phase two included the addition of three full-sized basketball courts, expanding the running track, a total renovation of the locker room spaces and more. Phase three, which is schedule to be complete in August 2017, will bring in the ‘wow’ factor with an indoor synthetic field, a 42-foot climbing wall and bouldering area and four squash courts.

According to Sherrard the Penn State renovation project was a thrill to work on. “This project and effort ranks near the top in my book,” he explained. Every square foot of the existing building was repurposed. It was the ultimate form of recycling.”

If you have ever undergone a renovation or expansion project, you know that choosing the perfect architecture firm is no easy task. But as Sherrard explained, the partnership between Penn State and Moody Nolan was a recipe for success:

“Great client + great facilities + great operations and people + challenging PSU energy requirement standards = a truly integrated and sustainable facility.”

One of the sustainable highlights of the renovated facility includes an innovative Hybrid Ventilation system. When the outside temperature and humidity set point are achieved, 40 percent of the outside new glass envelope opens automatically to channel fresh air through the entire facility.

Since they were not constructing a new building from scratch, but instead repurposing the existing building, Sherrard explained, some of the biggest challenges throughout the process arose when dealing with the original building structure. “We spent a lot of time studying, planning and designing through this effort — along with a great Construction Management partner,” said Sherrard. “Challenges that did surface where dealt with immediately so they never escalated into anything significant. On a renovation/expansion project a close working relationship between the architect and Construction Manager is critical to a successful project.”

However, while dealing with an existing structure can post its challenges, Sherrard said those tend to be the most rewarding projects. “To me, renovation and expansion projects can be the most rewarding since one can feel and see the transformation,” he added.

Pro Tip: “My best advice is if taking on a large renovation/expansion, think beyond what is there (we are trained to do this, but it is tough for others) and we will help you get there. Also, it is safe to assume that unknown situations will surface along the entire process and the team should be ready to adjust course to react.”

Learn more about the Penn State Intramural Building renovation and expansion project here. 

Tags: architectureExpansionfacility developmentMoody NolanPenn State
Previous Post

Virginia Tech

Next Post

Five Questions with Stan Shingles

Kyle Dyer

Kyle Dyer

Related Posts

Get in Front of Campus Rec Decision Makers at the 2026 Campus Rec Leadership Summit
News

Get in Front of Campus Rec Decision Makers at the 2026 Campus Rec Leadership Summit

February 10, 2026
Inside Paddock Pool Equipment Company’s Longstanding Partnership in Aquatics Construction
Facility Development

Inside Paddock Pool Equipment Company’s Longstanding Partnership in Aquatics Construction

February 2, 2026
Rethinking Campus Rec Aquatics Design for Year-Round Impact
Aquatics

Rethinking Campus Rec Aquatics Design for Year-Round Impact

January 22, 2026
flooring in campus rec
Facility Development

Activity to Aesthetics: How to Pick the Best Flooring for Your Campus Rec Facility

December 16, 2025
From the Ground Up: How Duke Kunshan University Created a Recreation Program from Scratch
Facility Development

From the Ground Up: How Duke Kunshan University Created a Recreation Program from Scratch

November 6, 2025
Purdue Campus Rec Elevates Climbing Experiences with Innovative Upgrades
Facility Development

Purdue Campus Rec Elevates Climbing Experiences with Innovative Upgrades

October 30, 2025
Next Post
Five Questions with Stan Shingles

Five Questions with Stan Shingles

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Get Updates in your inbox

Facebook Twitter Instagram LinkedIn
Campus Rec Logo

The premier business resource for college and university recreation centers.

The Current Issue

January/February 2026

January/February 2026

Browse

  • Home
  • Subscribe
  • E-Newsletter
  • Podcast
  • Media Kit
  • Contact

© 2026 Campus Rec Magazine. Published by Peake Media.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Sections
    • Columns
    • Facility Development
    • News
    • Operations
    • Programming
    • Rec of the Month
    • Staff Development
    • Well-being
    • Profiles
  • Magazine
    • Current Issue
    • Past Issues
    • Subscribe
    • E-Newsletter
    • Contact Us
  • On-Demand
    • Exclusive Interviews
    • Podcast
    • Webinars
  • Supplier Insights
    • Brand Voice
    • Supplier News
    • Supplier Voice
  • Education
    • CR Leadership Summit
    • CR Base Camp
    • Pickleball Innovators
  • Buyer’s Guide

© 2026 Campus Rec Magazine. Published by Peake Media.